Sunday, February 13, 2011

Trailer Progress

Matt and I made the 1000 mile round trip to pick up the new trailer a couple of weeks ago. It looks great and I can't wait to get cooking with it! First things first though as we have lots of work to do to build out the kitchen in the enclosed area. Here is what she looked like when we got it home


I spent the last two weeks laying out the inside and ordering parts. I ended up ordering cabinets from http://www.pitproducts.com/ and I can't wait to see them. By far the most inexpensive aluminum cabinets I could find. The reviews I've read are good and I hope the quality is as good as they say. I found tanks and a three bay sink on ebay. I ordered a Bosch Ariston 4 gallon water heater, a ShurFlo 115V RV Pump, and a ShurFlo accumulator tank from amazon.com. With all that Matt's got his work cut out for him to make us a kitchen with runnning water!


Kim and I installed the vinyl flooring yesterday and I think it looks great. We also decided to add an additional outlet for the water heater, Brian got that installed yesterday as well. With any luck the cabinets should arrive this week and installation can begin. I signed us up for a contest in North Kansas City on March 11st, so that is the new deadline! I will post pictures again as we make more progress.


1 comment:

  1. Joe,

    Looks like the trailer is coming along quite nicely. Can't wait to see the finished product in person at the NKC contest. See you and the Tippy Who crew soon.

    Travis

    ReplyDelete